Stainless Exhaust Header for 1986-1991 BMW E30 325 325i 325e 2.5L 2.7L L6

In stock
SKU
APS001165
  • Free Shipping - 48 US States
Quick Overview

86-91 BMW 325i 325iX 325is 325 325es 325e 2.5L 2.7L L6, 2" Outlet, Polished Stainless Steel

Special Price $125.59 Regular Price $173.67
Stainless Exhaust Header for 1986-1991 BMW E30 325 325i 325e 2.5L 2.7L L6

Description

SSN headers are the perfect combination of quality and value. The T-304 stainless steel with CNC machine flanges of TIG and MIG welded construction. Computerized Mandrel-Bends bending maximizes the smoothest exhaust airflow for your vehicle and achieves better exhaust gas scavenging and reduced back pressure.

Overview

Type:Exhaust Header
Condition:New
Warranty:1 Year
Color:Metallic
Inlet Size:1.5 in
Outlet Size:2 in
O2 Sensor Bung Included:Yes
Materials:T-304 Stainless Steel
Surface Finish:Chrome Polished
Mounting Hardware Included:Yes
Interchange Part Number:HDSE30
Package Includes:1x Header and necessary hardware
NOTE:* Professional Installation is Highly Recommended (No Instruction Included)
* BMW E30 Models with 2.5L/2.7L l6 Engines ONLY

⚠️WARNING: This product can expose you to chemical which is known to the State of California to cause cancer and birth defects or other reproductive harm. For more information go to www.P65Warnings.ca.gov.

VEHICLE NAMEYearEngine
BMW 3251986~19882.7L
BMW 325e1986~19872.7L
BMW 325es1986~19872.7L
BMW 325i1987~19912.5L
BMW 325iX1988~19912.5L
BMW 325is1987~19912.5L
Write Your Own Review
You're reviewing:Stainless Exhaust Header for 1986-1991 BMW E30 325 325i 325e 2.5L 2.7L L6
Your Rating

Shipping Policy

Please confirm the shipping address and billing address. The shipping address should be a physical address, we DO NOT ship to the P.O. box address.

Handling Time

Once the order was placed please allow us 1-2 business days for packing and shipping, checking the order information is a very important step to build a better shopping experience.
Special Case: For the transaction paid by using a PayPal eCheck, the payment will be completed within 3-6 business days. The handing and shipping should be started up as soon as the payment is successful.