2004.5-2010 Chevy GMC LLY LBZ LMM 6.6L Duramax Diesel Turbo 3" Downpipe Exhaust
- Free Shipping - 48 US States
04-10 Silverado/Sierra 2500HD/3500HD, LLY LBZ LMM Duramax Diesel, 3" Pipe, Polished Stainless Steel
Buy 2 | Buy 10 | Buy 20 | Bulk Purchase |
$84.66 /ea | $82.93 /ea | $82.07 /ea | Contact Us Unlock 5%-20% discounts on top-quality products for our wholesale partners. Contact us now! Skypelive:.cid.3e5ce2a4752431c Email[email protected] |
Description
Upgrade your exhaust system with SSN downpipe. This downpipe uses 16 gauge mandrel bent tubes for maximum flow, is made of high-quality T-304 stainless steel and uses extremely durable high-temperature ceramic coating. The downpipe can deepen the diesel engine's sound while lowering EGT and providing a quicker throttle response.
The downpipe is the pipe that connects the turbocharger to the exhaust system. This tube helps guide exhaust gasses from the car's turbine section into the exhaust system, making sure everything flows smoothly.
Overview
Type: | Exhaust Down Pipe |
Condition: | New |
Warranty: | 1 Year |
Color: | Black |
Inlet Diameter (IN): | 3 Inch |
Outlet Diameter (IN): | 3 Inch |
Fuel Type: | Diesel |
Materials: | T-304 Stainless Steel |
Surface Finish: | Chrome Polished |
Mounting Hardware Included: | No |
Package Includes: | 1x Downpipe |
NOTE: | * Professional Installation is Highly Recommended (No Instruction Included) |
⚠️WARNING: This product can expose you to chemical which is known to the State of California to cause cancer and birth defects or other reproductive harm. For more information go to www.P65Warnings.ca.gov.
VEHICLE NAME | Year | Engine |
---|---|---|
Chevrolet Silverado 2500 HD | 2004~2010 | 6.6L |
Chevrolet Silverado 3500 HD | 2007~2010 | 6.6L |
GMC Sierra 2500 HD | 2004~2010 | 6.6L |
GMC Sierra 3500 HD | 2007~2010 | 6.6L |
Shipping Policy
Please confirm the shipping address and billing address. The shipping address should be a physical address, we DO NOT ship to the P.O. box address.
Handling Time
Once the order was placed please allow us 1-2 business days for packing and shipping, checking the order information is a very important step to build a better shopping experience.
Special Case: For the transaction paid by using a PayPal eCheck, the payment will be completed within 3-6 business days. The handing and shipping should be started up as soon as the payment is successful.